Saturday, May 1, 2010

Basement Electrical Done! Completly, 100%

Although this photo is of the incomplete basement panel and sub panel, and in fact at this moment the electrical is not done, in a few hours, it will be.
(This does not include CAT5 and COAX)

That is a 100amp sub-panel being fed from upstairs, and a sub sub-panel which is 60amps. That a lot of power for a basement. The old feed to our house ( 4 years ago) was only 100amps total. And at one point the house had a 60 amp breaker due to an electrician mess up.

No comments:

Post a Comment