Wednesday, December 23, 2009

Electrical Done! Heating in!

Here is Tristan and Greg helping clear the ready to insulate area of the basement. The Studio will be done at a latter date.


Finally Done !!!!
All the electrical wiring is done in order for the basement to be drywalled, all except the Studio.
Well.... not exactly... today the wire for the air conditioning needs to be run so.... But really we are done.
We have also run the CAT5 internet/telephone wire, and CAT6 wire, which although nothing uses it yet, one day they hopefully will. Also ran the coaxial RG6 for cable and RG59 for CCTV which we may eventually put in. The RG6 can handle the high definition signal, CCTV only needs the 59 but also needs to be powered by 18/2 from a cental transformer or adapter. You can also get the RG59+18/2 in combination which is also called siamese cable. Cat 5 was also used for the intercom.
And in True Rohon Style : we have internet connections on the kitchen counter.

We have also decided to run the ventilation through the mechanical room. More on that to come.

Also Got all them heating lines in thanks to our plumber Murry next door. He has been a lifesaver. It's been 4 year since the old oil powered coal furnace was disconnected. And while the new electrical one is not yet installed... it won't be much longer.