Sunday, May 17, 2009

May 13+14






Progress continues on the rockwall! Slowly though, but it's going to look real good. Inside, on the other hand, is continuing to deconstruct itself. I'v had to redo the " Control panel" in the bathroom due to the wall moving out an inch to properly fit the bath. The bathroom circuits are also now wired to the main breaker and I'v wired the bathroom fan.!! woot ...fans!!!

In the hall way, we are installing the smoke detectors and the lights. The lights are going to be two sets of track lights conected with an "L" conector..... which .... doesn't exist in grey..... the same colour of our tracks. We also will need to cut them for them to fit.