This is an update of what the house looks like.
May 20th. After a few more days of destruction.
Thursday, May 21, 2009
May 20 video
Sunday, May 17, 2009
May 13+14
Progress continues on the rockwall! Slowly though, but it's going to look real good. Inside, on the other hand, is continuing to deconstruct itself. I'v had to redo the " Control panel" in the bathroom due to the wall moving out an inch to properly fit the bath. The bathroom circuits are also now wired to the main breaker and I'v wired the bathroom fan.!! woot ...fans!!!
In the hall way, we are installing the smoke detectors and the lights. The lights are going to be two sets of track lights conected with an "L" conector..... which .... doesn't exist in grey..... the same colour of our tracks. We also will need to cut them for them to fit.
Saturday, May 16, 2009
Luke says:
This is stupid. I havent had a light in my room for about.. 5 months. I hope we can finish the electrical soon, but this shouldnt get in the way of the bathroom, the rockwall, the yard........
WHEN WILL IT END?!!
I will upload pictures soon.
WHEN WILL IT END?!!
I will upload pictures soon.
Thursday, May 14, 2009
Rockwall started
Sunday, May 10, 2009
Bathtub arrived.
Yes finally after two failed deliveries, the tub has arrived. How the f*** did they get it into the house? It is a tub/ shower combo unit, with leds and air jets, thats why its so big. To get it into the bathroom eventually, we had to cut a hole in the wall of the bathroom.
That's the 12" shower head for the shower... it's also not the only one.. yes this was my dads idea.
That's the 12" shower head for the shower... it's also not the only one.. yes this was my dads idea.
Saturday, May 9, 2009
Some holes filled.
Re-plumbing the house.
Thanks to our great neighbor Murry, all the piping downstairs has been recessed into the ceiling. As well, he has done all the plumbing for the new bathroom. And new laundry closet( talk about that in a future post.)
As you can see, the pipes are all hanging out everywhere, which is just fine for a basement, but we plan to start finishing the studio soon. That black abs pipe is in its new location so that is doesn't go through the ceiling of the studio.
As you can see, the pipes are all hanging out everywhere, which is just fine for a basement, but we plan to start finishing the studio soon. That black abs pipe is in its new location so that is doesn't go through the ceiling of the studio.
Lots of progress
Wow I'v been gone for 3 weeks and a lot has happened. Only leaving the house in a more chaotic state. There is no a bunk bed in the front entrance of the house, and piles of rock in the backyard